Installation
Have the ground completely prepared before you order your sod
If you are not going to lay the sod within eight hours, cover it with moist burlap or stack it in the shade
Lay the first line of sod along a straight line such as a driveway, sidewalk or string stretch between two stakes.
Lay sod in a brick-work fashion
Stake sod on extreme slopes
Roll over sod with a roller to press roots to the soil
Saturate the area with water immediately! One gallon of water in the first hour does more than several gallons later.
